tch: Timber Charring

Start-of-charring calculation for planar timber members protected by one or more layers according to EN 1995-1-2:2026.

tch: Timber Charring interface preview

Main use cases

  • Protected CLT and other planar timber members
  • Comparison of cladding and insulation build-ups
  • Determination of t_ch for subsequent timber fire design

Main features

Protection build-up

Define only the layers between the fire and the timber member, in order from the exposed side.

Orientation-aware method

Account for vertical, underside, or top-side exposure together with material, thickness, density, and joint details.

Charring start result

Calculate the total protection time t_ch and inspect the contribution and adjustment assigned to every layer.

Supported inputs

  • Wall, floor, or ceiling orientation
  • Protective layer sequence
  • Layer material and thickness
  • Panel-joint configuration
  • Density and material-specific properties

Results generated

  • Start time of charring t_ch
  • Protection time of each layer t_prot,i
  • Layer interaction increments Delta t_i
  • Material and layer calculation trace

Available results and exports

WEBLayer-by-layer protection summary
PDFDetailed calculation report